Sandestin Wastewater Treatment Plant Digester #2 Upgrade


  • Project included the design and construction of a new 500,000 Gallon aerobic digester to replace a 30 year old converted steel tank, complete with concrete storage tank, air diffuser system, 100 HP blowers, sludge transfer pump system and access platform located in Miramar Beach, Florida.
  • Project responsibilities included, but were not limited to:
    • Detailed engineering and design
    • Regulatory permitting
    • Development of project specifications and bid packages
    • Solicitation of material and construction bids
    • Review contractor and material supplier pre-qualifications and award contracts
    • Construction supervision/management, inspection and certification
  • Project Summary:
    • Demolition and disposal of existing steel structure and foundation
    • Site grading and testing
    • 500,000 gallon concrete process tank
    • Two (2) 100 HP blowers and integrated controls
    • Renovated blower building
    • Coarse air diffuser system and piping
    • Aluminum access stairs and operations platform
    • Engineering Schedule: 8 weeks
    • Construction Schedule: 12 weeks
    • Approximate Project Cost: $650,000