- Project included the design and construction of approximately 68,000 linear feet of thirty-inch (30”), twenty-four-inch (24”), eighteen-inch (18”) and twelve-inch (12”) raw water transmission lines, five (5) high-capacity potable water wells, a 3,000,000 Gallon Ground Storage Tank and a 13.0 MGD automated Chlorine Booster Station near Freeport, Florida.
- Project responsibilities included, but were not limited to:
- Detailed engineering and design
- Regulatory permitting
- Development of project specifications and bid packages
- Solicitation of material and construction bids
- Review contractor and material supplier pre-qualifications and award contracts
- Construction supervision/management, inspection and certification
- Project Summary:
- 19,500 linear feet of thirty-inch (30”) diameter ductile iron pipe
- 29,200 linear feet of twenty-four-inch (24”) diameter PVC pipe
- 10,300 linear feet of eighteen-inch (18”) diameter PVC pipe
- 9,000 linear feet of twelve-inch (12”) diameter PVC pipe
- Engineering Schedule: 12 weeks
- Construction Schedule: 48 weeks
- Approximate Project Cost: $6,500,000