- Project included the design and construction of a new 500,000 Gallon aerobic digester to replace a 30 year old converted steel tank, complete with concrete storage tank, air diffuser system, 100 HP blowers, sludge transfer pump system and access platform located in Miramar Beach, Florida.
- Project responsibilities included, but were not limited to:
- Detailed engineering and design
- Regulatory permitting
- Development of project specifications and bid packages
- Solicitation of material and construction bids
- Review contractor and material supplier pre-qualifications and award contracts
- Construction supervision/management, inspection and certification
- Project Summary:
- Demolition and disposal of existing steel structure and foundation
- Site grading and testing
- 500,000 gallon concrete process tank
- Two (2) 100 HP blowers and integrated controls
- Renovated blower building
- Coarse air diffuser system and piping
- Aluminum access stairs and operations platform
- Engineering Schedule: 8 weeks
- Construction Schedule: 12 weeks
- Approximate Project Cost: $650,000