The work

Site and structure for the utility office.

Location
Inlet Beach, FL
Market
Municipal and Utility
Disciplines
Civil Engineering, Structural Engineering

Scope performed

Each line below is a discipline our staff carried on this project. The description explains what that work involves and what the owner receives at the end of it.

Land Development and Site Design

Turning a parcel into a buildable site. Grading, layout, utility routing, and a drawing set a reviewer can approve.

  • Site and grading plans
  • Utility layout
  • Construction details
  • Quantity basis for bidding

New Building Structural Design

The gravity and lateral system for a new building, designed to the current Florida Building Code and the wind exposure the site sits in.

  • Structural drawings
  • Load calculations
  • Signed and sealed documents for permit

How an engagement like this runs

Work in Inlet Beach follows the same sequence at any size. Owners see the same four stages.

  1. 01

    Scoping call

    We ask what prompted the call, what documents already exist, and what deadline is driving the schedule. If the work does not need an engineer, we say so.

  2. 02

    Field work and review

    A licensed engineer or a staff member working under one goes to the site, documents conditions, and reviews the drawings and reports already on file.

  3. 03

    Signed and sealed deliverable

    Findings, drawings, and specifications go out under seal, written so a board can read them and a contractor can bid from them.

  4. 04

    Contract Administration

    During construction we review submittals, answer requests for information, perform Construction Observations, and review pay applications against work in place.

Questions about a similar building? Call the office nearest the site or send the address and the scope, and the discipline lead who owns that work will answer. Compare the Civil Engineering scopes we carry.

Services behind this project

Licensed staff who carry this work

Project photography

Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 1 of 8.
View 1 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 2 of 8.
View 2 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 3 of 8.
View 3 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 4 of 8.
View 4 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 5 of 8.
View 5 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 6 of 8.
View 6 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 7 of 8.
View 7 of 8
Inlet Beach Water System Office, a civil infrastructure project engineered by O'Connell and Associates. View 8 of 8.
View 8 of 8
Next step

Have a treatment plant, pipeline, or roadway project? Talk to our municipal team.

Send the site, the scope, and the deadline. We will route it to the discipline lead who owns that type of work.