Land Development and Site Design
Turning a parcel into a buildable site. Grading, layout, utility routing, and a drawing set a reviewer can approve.
- Site and grading plans
- Utility layout
- Construction details
- Quantity basis for bidding
Santa Rosa Beach, FL
The work
Site and structural engineering for the apartment community.
The Martha's Lane Condominium scope included civil and structural engineering services for a proposed +/- 2.5-acre multifamily development in Santa Rosa Beach consisting of two two-story condominium buildings, associated parking, an amenity area, internal drives, utilities, stormwater infrastructure, retaining walls, and a new roadway connection to County Road 30A. The original civil scope included preliminary site planning, stormwater modeling and reporting, construction plans for grading, drainage, parking, utilities, and a sanitary sewer lift station, as well as Walton County Major Development Order and related utility and environmental permitting. Subsequent change orders added structural design for approximately 23,600 square feet of condominium buildings and a modular block retaining wall, civil plan revisions associated with the wall and slab foundations, and the design and permitting of a paved roadway to County Road 30A with related drainage and utility extensions.
Each line below is a discipline our staff carried on this project. The description explains what that work involves and what the owner receives at the end of it.
Turning a parcel into a buildable site. Grading, layout, utility routing, and a drawing set a reviewer can approve.
The gravity and lateral system for a new building, designed to the current Florida Building Code and the wind exposure the site sits in.
Work in Santa Rosa Beach follows the same sequence at any size. Owners see the same four stages.
We ask what prompted the call, what documents already exist, and what deadline is driving the schedule. If the work does not need an engineer, we say so.
A licensed engineer or a staff member working under one goes to the site, documents conditions, and reviews the drawings and reports already on file.
Findings, drawings, and specifications go out under seal, written so a board can read them and a contractor can bid from them.
During construction we review submittals, answer requests for information, perform Construction Observations, and review pay applications against work in place.
Questions about a similar building? Call the office nearest the site or send the address and the scope, and the discipline lead who owns that work will answer. Compare the Civil Engineering scopes we carry.
The scope page behind the Martha's Lane Apartments engagement.
The scope page behind the Martha's Lane Apartments engagement.
President / Principal Engineer
Civil Engineering Manager
Senior Civil Engineer








Send the site, the scope, and the deadline. We will route it to the discipline lead who owns that type of work.