The project consisted of the development of a portion of a 38-acre of land and included the design and permitting of infrastructure necessary to service a new 5,100 sq.ft. restaurant and clubhouse building complete with an 8,000 sq.ft. pool and lazy river located in WaterSound Beach, Florida. Infrastructure design included paved areas such as roadways, sidewalks and parking, potable water and sanitary sewer utilities and a stormwater drainage and management system. Permitting included a Walton County Minor Development Order, Florida Department of Environmental Protection (FDEP) Stormwater Permit, FDEP Water Distribution Permit, and a FDEP Wastewater Collection Permit.